« History Show - and "Have you seen an arrow?" | Main | American Indian Show »

1.5 day setup... 30 minute strike

This morning the scenic group put up the big filmstrip. Our job was to put more of these LED bars around the edges. Our hopes were to get the lights to chase each other but we weren’t quite successful. Afterwards I did a job for Johnny Westmyer and Ryan Bushore, who are from my lodge, to go do some printing in the office.

After the history show, down came all the LED lights. It took us a day and a half to get them set and only 30 minutes to strike. WOW!

This time I actually got some good sleep. But I’m sure we’re all still tired from this weeklong event. We have the Indian dance show tomorrow night. I’m still trying to support Evan through his struggle on the theme show. I really want to support him through this. It’s hard to think that in 72 hours it will all be over.

TrackBack

TrackBack URL for this entry:
http://www.oashows.org/cgi-bin/mt-tb.cgi/3

Comments (1)

Bruce:

Brandin - Evan did a super job so thanks for helping him out. You always go above and beyond the call of duty.

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

About

This page contains a single entry from the blog posted on July 30, 2006 10:05 PM.

The previous post in this blog was History Show - and "Have you seen an arrow?".

The next post in this blog is American Indian Show.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 3.31